Results & Deliverables
The CLUG project is structured in five work packages. Each one of them will be subject to many deliverables. You will find below the deliverables in their final status.
| Deliverable Number | Title | Description | Dissemination Level | Due Date |
|---|---|---|---|---|
| Dissemination Plan | ||||
| D2.1 | High Level Mission Requirements Definition | Public document with the definition of the high level mission requirements that are the basis for the deviation of high level system requirements. |
Public | 30 Nov 2020 |
| D2.2 | Operational Scenarios Definition | Public document with the definition of scenarios of railway operation, relevant for the project. |
Public | 30 Nov 2020 |
| D2.7 | Identified Validation Certification Methods | D2.7 identifies the most suitable methods for validation and certification considering work from WP2.3, WP 2.6 and WP2.7 and taking into account the legal background. D2.7 is the main input for D5.10 the prototypical certification. |
Public | 31 May 2021 |
| D4.3 | Ground Truth | The ground truth (true position of the train) generated for the individual test runs will be delivered in an agreed format, supplemented by a description on how the ground truth has been generated. This will allow the involved parties to re-evaluate the collected raw data at a later stage against the true position of the train. |
Public | 31 May 2021 |
| D5.3 | Project brochure | Public project brochure. |
Public | 31 May 2021 |
| D5.4 | Definition of the Required maps for Localisation | It defines, according of the results of the different WPs, a comprehensive definition of the digital map for the train localisation system |
Public | 30 Nov 2021 |
| D5.6 | Final Dissemination Report | The report presents the project communication and dissemination activities’ results. |
Public | 30 Nov 2021 |
| D5.7 | Preliminary Definition of the System Performances and Interfaces | It provides : |
Public | 30 Nov 2021 |